Building Inspections

At various stages during construction you will need to arrange for a Building Officer to inspect what has been done in order to ensure that your building work complies with the conditions of the Building Consent and the Building Code.

For further information, check out Building Consent Steps 3 & 4: Inspecting and Certifying (900KB pdf)


How to book an inspection

A list of required inspections will be included with your Building Consent. This may not be a full list of the required inspections (due to differing construction methods, etc). You need to book these as each stage of work is completed.

Inspections are available most days with 24 hours notice of inspection needs, and can be conducted generally between 8.00am and 4.00pm.

You can book an inspection by phoning our Customer Services team on 06 374 4080 or 06 376 0110 or by using the GoBuild app on your smartphone.

When you make your booking, you will need to supply the following information:

  • your Building Consent number
  • the site location/address
  • the type of inspection required; and
  • the name and contact phone number of the person who will be on-site at the time of inspection

All Building Consent documents and any approved amendments must also be on-site at the time of inspection.

Find out more about GoBuild


Meeting the requirements of the Building Consent and Building Code

Re-inspections may be required if the Building Officer is not satisfied that the work meets the requirement of the Building Consent and the Building Code. These may incur additional charges if inspections exceed those estimated when you lodged your Building Consent application.

The work must be carried out in accordance with your approved Building Consent. If you wish to change some aspect of the project, you must first obtain an amendment to the Building Consent before the work is carried out. The process for obtaining and amendment is the same as obtaining the original consent. It is very important that at the time of inspection the Building Consent documents accurately reflect what has actually been built.

If the work has not been done in accordance with the Building Consent, the Building Officer will fail the inspection and issue a copy of the inspection record stating what is required to be done.

If work complies with the Building Consent, the Building Officer will pass the inspection and issue a copy of the inspection record.


Final inspections

When all the planned work is completed and inspections are complete, book your final inspection. Make sure you have copies of all the documents that were supplied with your application. They must be on-site at the time of your final inspection.


Council is happy to answer any questions you may have regarding the building consent process. You can get in touch with the Council team by phoning 06 374 4080 or 06 376 0110. Alternatively, you can email info@tararuadc.govt.nz.